国产精品av久久久久久麻豆网,亚洲精品福利在线观看,亚洲国产精品尤物yw在线观看,国产传媒一区在线

News Center

Location: Home >News Center

News Center

Recommend

Contact Us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

Bridge construction matters

2023-10-09
710次

1、 Construction

Measurement and positioning → Support and hanger manufacturing device → Bridge device → Grounding treatment

2、 Construction methods and skill methods

(1) Measurement and positioning: Use the line snapping method to mark the equipment position of the bridge, determine the fixed position of the bracket, and mark it correctly. Composite cable tray is the second generation product in the cable tray series and a new type of cable tray. It is suitable for laying various projects, units, and cables. It has the characteristics of simple structure, flexible configuration, convenient installation, and novel form. The positioning of the bridge in the vertical shaft should first use the suspension line method to determine the device reference line. If the reserved hole is not suitable, it should be adjusted and repaired in real time.

(2) Bracket manufacturing device

(3) According to the construction drawing design elevation and bridge specifications, locate and manufacture the bracket based on the measured dimensions. These brackets are produced in the factory. All components of the cable tray need to be galvanized and installed on the outdoor tray outside the building. The full name of a rigid structural system, including straight sections, elbows, tees, groove types, tray or stepped cross sections, as well as support arms, hangers, etc., which have tightly connected support cables. Slot type cable tray, also known as slot type cable tray, is a fully enclosed cable tray suitable for laying computer cables, communication cables, thermocouple cables, and other control cables for high sensitivity systems. It has good effects on shielding control cables from interference and protecting cables in highly corrosive environments. There is no ceiling beam bottom lifting or wall support device, but there is a ceiling internal lifting or wall support device. In public places without suspended ceiling, connect structural members, and take into account the beauty and convenience of construction and maintenance, use wall or column support devices or install them on the bottom chord members of Truss roof. The bracket of the wall mounted device is fixed with expansion bolts, and the spacing between the brackets does not exceed 2 meters. Supports and hangers should be added at the intersection of straight and non straight sections, at the deformation joints of buildings, and in the middle of non straight sections with a bending radius greater than 300mm. The support and hanger device should ensure that the degree or verticality of the bridge meets the requirements.

(4) Bridging device

① Regarding the extraordinary appearance of the bridge, the dimensions measured on-site will be handed over to the means supplier, who will manufacture based on the dimensions and reduce on-site processing. The material, model, thickness, and accessories of the bridge meet the design requirements.

② Before installing the bridge, it is necessary to coordinate with various specialties to prevent conflicts between large diameter fire pipes, sprinkler pipes, hot and cold water pipes, drainage pipes, as well as air conditioning and exhaust equipment.

③ Lift the bridge to the predetermined position and secure it to the bracket with bolts. Carefully check the dimensions at the turn. The slope of this bridge should be the same as the slope of the building. For bridges on curved building walls, the curved shape should be consistent with the building. The bridge is connected to the bridge through a connecting plate, and the connecting bolt is a half round head bolt, which is located on the inner side of the bridge. The cracks between cable trays must meet the design requirements to ensure that the cable trays of the system are integrated.

④ Bridges crossing deformation joints in buildings should be treated as expansion joints in accordance with the enterprise standard "Special Steel Cable Tray Installation Technology". When the straight section of the steel bridge exceeds 30m, a thermal expansion compensation device should be installed.

⑤ The bridge device is horizontal and vertical, with a uniform and beautiful appearance


contact us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

亚洲成av人片在线观看无线| 亚洲日韩精品a∨片无码| 国产精品无码a∨精品影院app| 国产老熟女狂叫对白| 亚洲 高清 成人 动漫| 久本草在线中文字幕亚洲| av无码国产精品色午夜| 久久aⅴ人妻少妇嫩草影院| 亚洲人成人影院在线观看| 久久久亚洲精品成人| 精产一二三产区m553| 欧美三级真做在线观看| 人人妻人人澡人人爽人人精品97| 色欲视频综合免费天天| 久久香港三级台湾三级播放| 久久久久青草线蕉亚洲| 亚洲精品无码专区在线| 99久久精品九九亚洲精品| 日韩高清亚洲日韩精品一区二区三区 | 亚洲色欲在线播放一区| 18禁黄网站禁片免费观看国产| 人人狠狠久久亚洲综合88| 最新国产精品拍自在线观看| 无码h肉在线观看免费一区| 内射合集对白在线| 成人免费视频在线观看地区免下载| 国产av一区二区三区最新精品 | 一本丁香综合久久久久不卡网站| 男人用嘴添女人下身免费视频| 国产精久久一区二区三区| 狠狠噜天天噜日日噜色综合| 国产精品一区二区av交换| 国产欧美日本亚洲精品一5区| 国产sm鞭打折磨调教视频| 一本色道久久88加勒比—综合| 无遮挡边摸边吃奶边做视频免费 | 久久er99国产精品免费| 亚洲欧美中文字幕日韩一区二区| 国产精品无码一区二区在线看| 国产av一码二码三码无码| 色偷偷亚洲第一成人综合网址|